DELL EMC D-DP-DS-23 Dell Data Protection Design 2023 Exam Online Training
DELL EMC D-DP-DS-23 Online Training
The questions for D-DP-DS-23 were last updated at Nov 19,2024.
- Exam Code: D-DP-DS-23
- Exam Name: Dell Data Protection Design 2023 Exam
- Certification Provider: DELL EMC
- Latest update: Nov 19,2024
A customer has decided to connect their IDPA Top-of-Rack (ToR) switch using the 40 GbE QSFP+ uplinks.
If the customer core or distribution switch is a Cisco switch, how should the QSFP+ and cables be ordered?
- A . QSFP+ for IDPA ToR switch through Dell EMC
QSFP+ for customer switch through Dell EMC
MTP crossover cables through customer vendor or Dell EMC - B . QSFP+ and Twinax uplink cables through Dell EMC
- C . 40 GbE-to-40 GbE uplink cables with QSFP+ optics attached through Dell EMC
- D . QSFP+ for IDPA ToR switch through Dell EMC
QSFP+ for customer switch through customer vendor
MTP crossover cables through Dell EMC or customer provided
What is the approximate duplication rate for a Dell EMC Avamar server across all clients?
- A . 60% for file system data and 30% for database data
- B . 70% for file system data and 35% for database data
- C . 80% for file system data and 320% for database data
- D . 90% for file system data and 310% for database data
Which application is directly integrated with PowerProtect Data Manager?
- A . Kubernetes
- B . IBM DB2
- C . Cloudera Hadoop
- D . Microsoft SharePoint
A company is implementing a Dell EMC RecoverPoint solution for several key applications. All application have strict RPO requirements.
Which design factor will affect the RPO of each Consistency Group?
- A . Copy journal performance
- B . Size of the Protection volume
- C . Responsibility volume location
- D . Production Journal performance
A customer wants to perform a data center refresh. They want to standardize their backup infrastructure by using Dell EMC NetWorker and PowerProtect DD in an integrated environment.
The environment consists of:
– A primary data center with NetWorker and PowerProtect DD
– A disaster recovery (DR) data center with only PowerProtect DD
All data is backed up to NetWorker using a DD Boost device. The data is then copied to the DR data center. Data for several critical systems must be retained for seven years on tape at the DR data center. In order to configure and track backup jobs, the entire solution must be managed from a single unified interface.
Which application interface should be used?
- A . NetWorker Management Console
- B . Data Protection Advisor
- C . PowerProtect DD Management Center
- D . Backup and Recovery Manager
A customer wants to use 40 GbE breakout uplinks in a Dell EMC Integrated Data Protection Appliance (IDPA) factory-configured ToR switch.
Which customer environment needs to exist to make use of this uplink option?
- A . IDPA ToR switch needs to be connected to a Cisco switch
- B . Customer switch needs to have 16 unused Twinax or SFP+ optical ports
- C . IDPA ToR switch needs to be connected to a Dell switch
- D . SFTp+ transceivers and breakout cables need to be provided by the switch vendor
A customer has two new Dell EMC integrated Data Protection Appliances and wants to back up to both applications bidirectional. The data centers are connected by a WAN link that will also be used by other mission critical applications.
To prepare for replication, the customer wants to co-locate both appliances at one data center and configure replication locally minimize the initial replication traffic.
After the initial synchronization, one unit will be relocated and the network reconfigured at the disaster recovery data center, What is mandatory for this solution to be deployed?
- A . Approved RPQ
- B . IDPA v2.2
- C . Segregated replication interface
- D . Minimum 1000 MB WAN link
A customer is using Dell EMC RecoverPoint for VMs with a four vNIC configuration.
Which vRPA network component communicates with VMkernel ports in IP Communication mode?
- A . LAN vNIC
- B . Management vNIC
- C . WAN vNIC
- D . Data vNIC
How can the maximum capacity of 96 TB in the Dell EMC PowerProtect DP4400 (24 TB – 96 TB) be fully utilized?
- A . Set up full capacity during the deployment with Data Protection Central.
- B . Add disk packs of 24 TB and capacity licenses must be ordered.
- C . Add additional capacity licenses with no additional hardware to purchase.
- D . Add disk packs of 12 TB and capacity licenses must be ordered.
In a Dell EMC RecoverPoint for VMs environment, what is the minimum vRPA configuration that supports compression and deduplication?
- A . 2 vCPUs and 4 GB RAM
- B . 2 vCPUs and 8 GB RAM
- C . 4 vCPUs and 8 GB RAM
- D . 8 vCPUs and 8 GB RAM