What does an EMC Avamar Accelerator node provide?
- A . Backup and recovery functionality for NAS storage devices
- B . Ability to offload processing from a Utility node
- C . Ability to offload processing from a Storage node
- D . Enhanced access to the Avamar File System
An administrator started an on-demand backup of a Dell EMC Avamar client. The backup is running low on performance, the daily scheduled backup for the same client is completing properly.
What is a possible cause for the issue?
- A . On-demand backups initiate a consistency check before the actual client backup
- B . On-demand backups in Avamar are generally slower than the scheduled backup
- C . On-demand backups are triggered while garbage collection is running
- D . On-demand backups will not check hash cache so more data is sent to the Avamar server
The average daily data added to an AVE is less than 4 GB per day in a file server-only environment and less than 10 GB in a mixed environment.
What is the minimum EMC AVE environment that can support these requirements?
- A . 0.5 TB
- B . 1.0 TB
- C . 2.0 TB
- D . 3.3 TB
By default, what does the asktime utility do when executed on the utility node?
- A . Reports the NTP server’s current time
- B . Reports the time on the execution node
- C . Configures the current time on the utility node and on all storage nodes
- D . Configures the current time on the execution node only
A Dell EMC Avamar backup administrator wants to add end-user workstations to the backup environment.
What is recommended when performing this activity?
- A . Start with a backup window of 15 hours
- B . Bring clients online in small groups
- C . Limit the number of clients to be added to a maximum of 2,500
- D . Configure the backups to run during the maintenance window
A Dell EMC Avamar server is having capacity issues. The Avamar server is displaying a critical system error alert.
Which maintenance window process is failing to complete causing the error alert?
- A . HFS check
- B . Garbage collection
- C . Replication
- D . Checkpoint creation
When backing up NAS devices to EMC Avamar, where does the data deduplication take place?
- A . Storage node
- B . NDMP Accelerator node
- C . NAS device
- D . Utility node
GSAN is currently unresponsive on the Dell EMC Avamar server. Dell EMC Support has indicated that the Avamar server will need to be rolled back.
What is the default number of choices of times available for rollback?
- A . 2
- B . 3
- C . 4
- D . 5
What is the result of installing the Upgrade Client package?
- A . All the existing clients will be upgraded to the latest release
- B . Avamar Downloads page is populated with all major client downloads
- C . The ISO image of avamar-kickstart is populated
- D . The Avamar installation GUI is started
Which of the following is a best practice when using an Avamar Desktop/Laptop Client?
- A . Include maintenance hours in Override Daily Backup Schedule
- B . Regularly monitor the amount of used backup storage
- C . Examine the impact of backups on weekly operational schedules
- D . Bring clients online in larger groups