Consider the following statements about risk-based testing.
I) Risk-based testing has the objective to reduce the level of protect risks.
II) Tests should be prioritized to find tie critical detects as early as possible.
III) Non-testing activities may also help to reduce risk
IV) Risks have to be reassessed on a regular basis.
V) The project stakeholders can give useful input to determine the risks
A . I III IV and V are true. II is false.
B . II, III IV and V are correct. I is false.
C . I, II and IV are true. III and V are false.
D . II, Ill and V are true. 1 ants Iv are false.
Answer: B
Explanation:
The following statements about risk-based testing are correct:
II) Tests should be prioritized to find tie critical detects as early as possible. Risk-based testing involves prioritizing tests based on risk level, which reflects both the likelihood and impact of defects or failures. Tests with higher risk level should be executed earlier than tests with lower risk level, in order to find and fix critical defects as soon as possible.
III) Non-testing activities may also help to reduce risk. Risk-based testing does not only involve testing activities, but also other activities that can help mitigate risks, such as reviews, inspections, audits, simulations or prototyping.
Latest ISTQB-CTFL Dumps Valid Version with 76 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund