GSAN just went down on the EMC Avamar server and is currently the backup window. EMC Support has indicated that the Avamar server will need to be rolled back. The checkpoints in the environment are completed automatically.
By default, to which time period can GSAN be rolled back?
A . Immediately after the last backup ran
B . During the last backup window
C . When GSAN went down
D . During the last maintenance window
Answer: D
Latest D-AV-OE-23 Dumps Valid Version with 430 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund