What is the MINIMUM trade size of sleeves recommended to serve a TR, ER, or EF?

The size and number of conduits or sleeves used for backbone pathways depend on the usable floor space served by the backbone distribution system. What is the MINIMUM trade size of sleeves recommended to serve a TR, ER, or EF?A . 2B . 4C . 6D . 8View AnswerAnswer: B

August 20, 2022 No Comments READ MORE +

The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?

The MINIMUM required for backbone floor to floor pathways is five (5) sleeves each being 103 mm (four trade size) in diameter What increase in usable floor space should another 103 mm (four trade size) sleeve be added?A . =929 m2 (10,001 ft2)B . =1858m2 (20,001 ft2)C . =3716 m2...

August 20, 2022 No Comments READ MORE +

When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?

When sizing an underground entrance facility, what is the MINIMUM amount of 103 metric designator conduits (4 trade size) that should be specified by the ICT distribution design?A . 2 ConduitsB . 3 ConduitsC . 4 ConduitsD . 6 ConduitsView AnswerAnswer: C

August 20, 2022 No Comments READ MORE +

What is the designer's role in the Vendor and Contractor Coordination?

An ICT distribution designer is representing a client during a project execution. What is the designer's role in the Vendor and Contractor Coordination?A . Oversee the sequence of the work and ensure that the job proceeds as anticipated in accordance with the project execution scheduleB . Synchronizes the daily activities...

August 20, 2022 No Comments READ MORE +

What is the RECOMMENDED bend radius of a conduit with an internal diameter of 51 mm (2 in)?

What is the RECOMMENDED bend radius of a conduit with an internal diameter of 51 mm (2 in)?A . 203 mm (8 in)B . 305 mm (12 in)C . 406 mm (16 in)D . 508 mm (20 in)View AnswerAnswer: D

August 20, 2022 No Comments READ MORE +

When designing for horizontal pathways in an environment that requires fire-stopping for penetrating a rated wall, what is the MAXIMUM till ratio for telecommunications cabling in a cable tray?

When designing for horizontal pathways in an environment that requires fire-stopping for penetrating a rated wall, what is the MAXIMUM till ratio for telecommunications cabling in a cable tray?A . 20 percentB . 40 percentC . 50 percentD . There is no fill ratio for cable trayView AnswerAnswer: B

August 20, 2022 No Comments READ MORE +

In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.

In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.A . 4B . 8C . 16D . 20View...

August 19, 2022 No Comments READ MORE +

An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased in size to accommodate an additional 40,000 ft2 (3716 m3) per floor. The designer's recommendation to the engineer will be to increase the slot area by_____for each additional 40,000 ft3 (3716 m2)

An ICT distribution designer is preparing a price quote for a building design with multiple floors originally sized at 40.000 ft (3716 m2). While the designer is preparing the quote, the structural engineer indicates the building has been increased in size to accommodate an additional 40,000 ft2 (3716 m3) per...

August 19, 2022 No Comments READ MORE +

Which of the following team members is responsible for ensuring compliance with me contract documents (CDP

Which of the following team members is responsible for ensuring compliance with me contract documents (CDPA . OwnerB . lCT Distribution DesignerC . ArchitectD . Construction Manager (CM)View AnswerAnswer: B

August 19, 2022 No Comments READ MORE +

Which of the following is the process of limiting fire and smoke using fire-resistive barriers?

Which of the following is the process of limiting fire and smoke using fire-resistive barriers?A . DetectionB . Compart mentationC . SuppressionD . PreventionView AnswerAnswer: A