Which two of the following are included in the ICT distribution designer's role of vendor and contractor coordination'? (Select two options.)

Which two of the following are included in the ICT distribution designer's role of vendor and contractor coordination'? (Select two options.)A . Conduct final ICT inspections to ensure standard and code compliance, design intent, and/or client requirements are met.B . Monitor project schedule for delaysC . Produce ICT closeout documentation...

August 25, 2022 No Comments READ MORE +

Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)

Which two of the following roles do an ICT distribution designer use to ensure a timely and cost-effective telecommunications construction project? (Select two options.)A . Discuss design concerns with inspectors. AHJs, and other stakeholders.B . Verify that the overall physical security design complies with the owner expectations.C . Assist in...

August 25, 2022 No Comments READ MORE +

A 3 trade size conduit is sized at

A 3 trade size conduit is sized atA . 78 mm (3 in)B . 91 mm (3 1/2 in)C . 103 mm (4 in)D . 129 mm (5 in)View AnswerAnswer: A

August 24, 2022 No Comments READ MORE +

The options for termination an unshielded twisted pair cable for a video surveillance camera at the camera end are an 8-pin 8 conductor outlet and

The options for termination an unshielded twisted pair cable for a video surveillance camera at the camera end are an 8-pin 8 conductor outlet andA . 8-pin 8-contact plug.B . 75 ohm balunC . 50 ohm balunD . biscuit jackE . shielded RJ-45 connectorView AnswerAnswer: A

August 24, 2022 No Comments READ MORE +

When planning a telecommunication termination area, what is the estimated space needed to terminate 144 strands of optical fiber?

When planning a telecommunication termination area, what is the estimated space needed to terminate 144 strands of optical fiber?A . 6350.01 mm2 (250 in2)B . 7315.21 mm2 (288 in2)C . 8890.01 mm2 (350 in2)D . 10972.82 mm2 (432 a)E . 14376.43 mm2 (566 in2)View AnswerAnswer: B

August 24, 2022 No Comments READ MORE +

What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?

What category/class of cabling does BICSI recommend for the MINIMUM performance level of horizontal balanced twisted-pair cabling?A . Category 5e/class DB . Category 6/class EC . Category SA/class EAD . Category 7/class FView AnswerAnswer: B

August 24, 2022 No Comments READ MORE +

Which two of the following items MUST be included in a detailed SoW? (Select two options.)

Which two of the following items MUST be included in a detailed SoW? (Select two options.)A . What type of work needs to be performedB . A general description of work to be performedC . Who must approve the Scope of workD . How the contract performance will be evaluated/judgedE...

August 23, 2022 No Comments READ MORE +

In a PON deployment, which active device is installed at the work area?

In a PON deployment, which active device is installed at the work area? Wireless access pointA . Optical amplifierB . Optical line terminalC . Optical network terminalD . SplitterView AnswerAnswer: D

August 23, 2022 No Comments READ MORE +

Which two of the following may the ICT distribution designer need to provide in order to identify the BEST solutions for the client's need? (Select two options.)

Which two of the following may the ICT distribution designer need to provide in order to identify the BEST solutions for the client's need? (Select two options.)A . Preliminary budget numbersB . Color scheme for dropcablesC . Documentation planD . Recommendations for label design of outletsE . Time constraints and/or...

August 23, 2022 No Comments READ MORE +

Communicating a project's design and technical specifications to the client and stakeholders is part of the ___________of the project.

Communicating a project's design and technical specifications to the client and stakeholders is part of the ___________of the project.A . scope of workB . needs analysisC . close out procedureD . bidding phaseView AnswerAnswer: A

August 23, 2022 No Comments READ MORE +