When designing horizontal pathways, the ICT distribution designer should consider the design’s ability to (Select two options.)
- A . handle only the day one needs as the future is unknown.
- B . minimize occupant disruption when horizontal pathways are accessed.
- C . handle at least 3 different cabling media types.
- D . accommodate cabling changes
- E . accommodate at least 50 percent future growth
For a six story building (plus a basement) each of the six floors has a useable area of =3716 m2 (40.000 ft2) There are two riser systems, each serving halt of the useable area on each Moor What are the sleeves quantity and configuration required from fifth floor to sixth floor?
- A . Two sleeves
- B . Three sleeves
- C . Four sleeves
- D . Five sleeves
An ICT distribution designer is estimating the installation of five units of 1.5 m (5 ft) tong channel basket trays connected together in the ceiling. The total length of the pathway needed is 7 5 m (25 ft).
How many supports will be needed”
- A . 2
- B . 5
- C . 7
- D . 10
- E . 20
Which of the following is TRUE about convenience receptacles?
- A . They are duplex or quad receptacles mounted on perimeter walls.
- B . They must be powered by emergency power to prevent loss of service.
- C . They shall be connected to occupancy sensors to ensure user safety.
- D . They increase the count of outlets needed on the equipment racks.
- E . They are those into which equipment, such as switches, shall be plugged
Which of the following is a common application for exothermic welding of earthing (grounding) and bonding conductors?
- A . Bonding to structural steel
- B . Locations requiring monthly maintenance
- C . Connections made to the TBB
- D . Cable to cable connections
Which of the following is the process of limiting fire and smoke using fire-resistive barriers?
- A . Detection
- B . Compart mentation
- C . Suppression
- D . Prevention
In which phase of the protect design would an ICT distribution designer be expected to prepare preliminary cost estimates?
- A . CD
- B . SD
- C . PD
- D . DD
Conducted coupling may affect electronic devices primarily through which two of the following means’? (Select two options.)
- A . inductive coupling (by magnetic fields)
- B . Input signal lines
- C . Output signal lines
- D . Optical signal lines
- E . Capacitive coupling (by electric fields)
Close out documentation is initially discussed in which of the following meetings?
- A . Prime Contractor and Subcontractor Meetings
- B . Kickoff Meeting
- C . Weekly Progress Meetings
- D . Vendor Meeting
An ICT distribution designer installed a 50/1 ?5 mm/1300 nm fiber optic cable from Building A to identical Building B with a distance of 600 m (1968 ft) At Building B. the designer fusion splice this new cable to an existing identical 50/126 mm fiber optic cable that runs 800 m (2525 ft) to Building C. Both ends are terminated with SC connectors.
What is the loss budget for the above fiber link?
- A . 2.95 dB
- B . 3.40dB
- C . 3.90 dB
- D . 4.35 dB