You are designing distribution for a seven unit townhouse with in slab conduits.
What is the MINIMUM number of 27 mm (1 in) rigid PVC Type 2 or metallic conduit that is required to satisfy distribution to each unit?
- A . Three
- B . Four
- C . Five
- D . Seven
- E . Fourteen
You have just finished a design calling for 15 telecommunications outlets. You received word that the owner has increased his requirements by 40%.
What size commercial DD (distribution device) is required to accommodate the increase?
- A . 660 mm (26 in)
- B . 1015 mm (40 in)
- C . 1346 mm (53 in)
- D . 1676 mm (66 in)
Which service is NOT typical of Grade 1?
- A . Telephone
- B . Multimedia
- C . Data
- D . Television
You are designing a multi-story dwelling and need to place the CTR’s. Every floor is not available.
What is the alternate spacing for the CTRs?
- A . Every 2 floors
- B . Every 3 floors
- C . Every 4 floors
- D . Every 5 floors
- E . 1st floor and midway up through the height of the building
You are designing a system requiring the transmission of data. Your system must perform higher than ________ kHz in order to do so.
- A . 4
- B . 8
- C . 10
- D . 16
- E . 32
To accommodate telephone, data, CATV, security and multimedia, a MINIMUM of ________ strands of optical fiber auxiliary disconnect outlet (ADO) cable should be provided.
- A . Two
- B . Four
- C . Five
- D . Six
- E . Eight
Which type of scheduling chart utilizes predecessor and successor relationships when identifying tasks?
- A . PERT
- B . Calendar
- C . Milestone
- D . Gantt
Which requirement does the ICT distribution designer provide to the Mechanical Engineer in charge of the HVAC design for a Telecommunication Space?
- A . The heat load (BTU (calories/hour) of all equipment installed within the space
- B . Location of the telecommunications own dedicated electrical distribution panel
- C . The quantity and size of HVAC vents needed for the room
- D . Location and size of condensate drain
Which of the following is a consideration for lighting telecommunication spaces?
- A . To ensure worker safety within TEs. Light level requirements are higher tor these than other spaces
- B . The light fixtures within telecommunications spaces shall be fluorescent type fixtures.
- C . The electrical power for lighting shall be connected to the same electrical panel as the telecommunications equipment.
- D . The lighting layout shall be coordinated with the equipment and pathway locations
In a budding with one join room for serving as the FR and EF and four dedicated TRs on the same floor a total of__________ 103 mm (4 trade size) conduits should be installed to interconnect the backbone pathways to the ER.
- A . 4
- B . 8
- C . 16
- D . 20