Razi is the Jira administrator for the WINDOWS Jira project. He received a new request to create a new Jira project called LINUX, and both projects need to have the same configurations.
Razi created the LINUX Jira project using the shared configuration option to ensure both projects have the same configurations.
Assuming the WINDOWS project is already configured with all of the below configurations, which configurations does Razi have to update in the LINUX project manually? (Choose three.)
- A . Status
- B . Project Avatar
- C . Version
- D . Priority
- E . Notification
- F . Components
Which JQL query can users use to get a list of issues in the current sprint for the "Udemy" project?
- A . project = "Udemy" AND Sprint in openSprints()
- B . project = "Udemy" AND Sprint in activeSprint()
- C . project = "Udemy" AND Sprint = activeSprint()
- D . project = "Udemy" AND Sprint = openSprints()
Which of the following are part of the Jira Automation rules? (Choose three.)
- A . Listeners
- B . Conditions
- C . Triggers
- D . Actions
- E . Requirements
- F . Steps
Users created a new custom field called Environment that has two values:
– Production
– Non-Production.
They need a table report to group issues from Production and Non-Production, and the overall status of those issues. The report should return a table containing three groups; issues with Production value, issues with Non-production value, and issues with a null value.
Which report is suitable for this use case?
- A . Time Since Issues Report
- B . Average Age Report
- C . Single Level Group By Report
- D . Resolution Time Report
- E . Pie Chart Report
- F . Time Tracking Report
Which of the following indicates that the productivity of the team is increasing in Control Chart report? (Choose two.)
- A . Rolling average line showing a downtrend.
- B . More issues or a group of issues are below the average line.
- C . Rolling average line showing an uptrend.
- D . Rolling average line is consistently close to the average line.
- E . More issues or a group of issues are above the average line.
Dom created an issue in Project A. Now he wants to move the issue to Project B.
According to the information below, which of the following fields will retain their values after moving the issue to Project B? (Choose two.)
Project A custom fields:
– Custom Field A – Text Field (single line)
– Custom Field B – Text Field (single line)
– Custom Field C – Version picker
Project B custom fields:
– Custom Field A – Text Field (single line)
– Custom Field C – Version picker
- A . Custom Field A
- B . Components
- C . Fix Versions
- D . Labels
- E . Custom Field C
- F . Custom Field B
Sarah created a new custom field called ‘Project Cost’. She cannot view the field in some of the issues.
Which of the following is true?
- A . ‘Project Cost’ value is empty.
- B . ‘Project Cost’ is one of the ‘Hidden fields’.
- C . She needs ‘Browse Projects’ permission.
- D . Some issues have ‘Issue Level Security’ applied.
__________ listen to any events selected by users to start their automation rules.
- A . Conditions
- B . Listeners
- C . Triggers
- D . Steps
- E . Requirements
- F . Actions
Razi accidentally deleted a column from the board. Assuming he has full access to manage the board, which of the following is true?
- A . The user cannot delete a column that contains at least one status.
- B . Statuses associated with that column will be deleted.
- C . Some issues will be deleted.
- D . All answers are incorrect.
- E . The number of issues in the report will change.
Razi’s team just completed their first sprint.
What can they learn from this chart? (Choose three.)
(Assume Remaining Estimate and Time Spent is disabled for this board.) This sprint ends with 0 story points.
- A . There are 2 issues resolved on July 8th.
- B . Some of the issues are still unresolved.
- C . This sprint starts with 20 story points.
- D . Some of the issues are resolved during non-working days.
- E . There are no scope changes in this sprint.