The demonstrated capacity of equipment in a process flow is $1,200 per day. Due to a malfunction in a feeder line, utilization
of the equipment is reduced by 25% on Day 6. If the efficiency remains unchanged at 110%, what would the output be on Day 6?
- A . $300
- B . $330
- C . $900
- D . $990
An outlier has been identified in the demand data for an item. The most appropriate next step would be to:
- A . set the forecast value to the outlier limit.
- B . screen the outlier for manual review.
- C . advance the forecast model in time, without smoothing.
- D . increase the length of the forecast time period.
Safety capacity in lean environments is:
- A . unnecessary waste to be reduced in the next kaizen event.
- B . where take time is greater than cycle time.
- C . provided by adding an additional shift.
- D . employing additional workers in peak periods.
A life cycle assessment (LCA) would be used to determine:
- A . the length of a long-term agreement.
- B . how an item should be scheduled.
- C . environmental aspects and impacts.
- D . if risk pooling would reduce inventory investment.
Risk pooling would work best for items with:
- A . low demand uncertainty and short lead times.
- B . low demand uncertainty and long lead times.
- C . high demand uncertainty and short lead times.
- D . high demand uncertainty and long lead times.
To facilitate transportation efficiency and inventory management, companies frequently use:
- A . automated storage/retrieval systems (AS/RS).
- B . small lot sizes.
- C . standardized containers.
- D . contract carriers.
A statistical safety stock calculation would be appropriate for:
- A . components used in multiple end items.
- B . new products at time of introduction.
- C . end items with stable demand.
- D . supply-constrained raw materials.
A part is sold as a service part, and it is also used as a component in another part.
Which of the following statements about the planning for this part is true?
- A . Its low-level code is zero.
- B . The material requirements for the part will be understated.
- C . The service part demand can be included in the gross requirements.
- D . It shouldn’t have any safety stock.
The benefits of standardized work include:
- A . consistent cycle time.
- B . more innovation.
- C . less finished goods inventory.
- D . shorter takt time.
Long lead-time items with stable demand would best be supported by a supply chain:
- A . using a pull system.
- B . linked through an enterprise resources planning (ERP) system.
- C . designed to be responsive.
- D . positioning inventory close to the consumer.