______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.
______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user's company.A . Risk criteriaB . Risk planC . Risk analysisView AnswerAnswer: A
When in accurate or insufficient failure data exists on the specific equipment item for quantative probability of failure analysis then
When in accurate or insufficient failure data exists on the specific equipment item for quantative probability of failure analysis thenA . General industry, company or manufacturer failure data usedB . Process hazard analysis failure data may be usedC . Process and toxic concentration analysis may be usedView AnswerAnswer: A
When the inspection program is optimized based on an understanding of risk, one or more of the following cost reduction benefits may be realized. Except one
When the inspection program is optimized based on an understanding of risk, one or more of the following cost reduction benefits may be realized. Except oneA . Ineffective, unnecessary or inappropriate inspection activities may be eliminatedB . Effective, necessary or appropriate inspection activities maybe eliminatedC . On-line or non-invasive inspection...
Method used for consequence analysis should demonstrate the ability to provide
Method used for consequence analysis should demonstrate the ability to provideA . Just an analysisB . No output is requiredC . The required level of discrimination between higher and lower consequence equipment items.View AnswerAnswer: C
Reliability efforts, such as reliability centered maintenance (rem), can be linked with rbi, resulting in an integrated program to
Reliability efforts, such as reliability centered maintenance (rem), can be linked with rbi, resulting in an integrated program toA . Reducedowntime in an operating unitB . Reduce operating time of a unitC . To reduce risk by mitigation activitiesView AnswerAnswer: A
Reliability efforts, such as reliability centered maintenance (rcm), can be linked with rbi, resulting in an integrated program to
Reliability efforts, such as reliability centered maintenance (rcm), can be linked with rbi, resulting in an integrated program toA . Reduce downtime in an operating unitB . Reduce operating time of a unitC . To reduce risk by mitigation activitiesView AnswerAnswer: A
If a very aggressive acid is carried over from a corrosion resistant part of a system into a downstream vessel that is made of carbon steel, the result would be
If a very aggressive acid is carried over from a corrosion resistant part of a system into a downstream vessel that is made of carbon steel, the result would beA . Rapid corrosion could result in failure in a few hours or days.B . General corrosion over a period of...
Thing or activity with a potential for con- sequence
Thing or activity with a potential for con- sequenceA . SourceB . HazardC . ToxicView AnswerAnswer: A
_____________represents the next generation of inspection approachesand interval setting, recognizing that the ultimate goal of inspection is the safety and reliability of operating facilities
_____________represents the next generation of inspection approachesand interval setting, recognizing that the ultimate goal of inspection is the safety and reliability of operating facilitiesA . RbiB . PhaC . HazopD . RcmView AnswerAnswer: A
Following are the non-inspection mitigation actions except one
Following are the non-inspection mitigation actions except oneA . Replacement or upgradeB . Equipment redesignC . Maintenance of strict controls on operating conditionsD . Risk management by monitoring the deteriorationView AnswerAnswer: D