______________ provides a consistent methodology for assessing the optimum combination of methods and frequencies.
- A . Rbi
- B . Rem
- C . Pha
- D . Hazop
A physical condition or a release of a hazardous material that could result from component failure and result in human injury or death, loss or damage, or environ- mental degradation
- A . Hazard
- B . Loss
- C . Failure
Following is the unit of measure of consequence that is least developed among those currently used for rbi assessment
- A . Affected area
- B . Cost
- C . Environmental damage
- D . Safety
Risk presented in quantitative risk analysis as a
- A . Precise numeric value
- B . Form of risk matrix
- C . Form of event tree and fault tree
The program that is focused on understanding failure modes, addressing the modes and therefore improving the reliability of equipment and process facilities.
- A . Rbi
- B . Pha
- C . Rem
- D . Hazop
Sec occurs when equipment is exposed to environments
- A . Conducive to certain cracking mechanisms
- B . Unfavorable to certain cracking mechanisms
- C . Unbeneficial to certain cracking mechanisms
Through__________________, inspection activities arefocusedonhigher risk items and away from lower risk items.
- A . Rbi
- B . Pha
- C . Rem
- D . Hazop
Following are the non-inspection mitigation actions except one
- A . Replacement or upgrade
- B . Equipment redesign
- C . Maintenance of strict controls on operating conditions
- D . Risk management by monitoring the deterioration
Consequence side of the risk equation is normally managed by
- A . Inspection alone
- B . Process safety personnel
- C . Management
- D . B&C
______________to be established to judge acceptability of risk couldhe an objective of the rbi assessment if such criteria do not exist already within the user’s company.
- A . Risk criteria
- B . Risk plan
- C . Risk analysis