An Integration Server contains a shared library with a common error handling routine. The shared library is redeployed with an updated error handling routine with some new logging. When will the applications that use the shared library start using the updated routine?
A . Immediately.
B . When the Integration Node is restarted.
C . When the Integration Server is restarted.
D . After each application that uses the shared library is redeployed.
Answer: A
Latest C9530-001 Dumps Valid Version with 122 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund