Refer to the exhibit.
After a failover occurs, which two actions must be performed on Switch-B to manually preempt the operational primary role back to Switch-A? (Choose two.)
A. Configure the local vPC role priority to have a higher value than Switch-A.
B. Configure the local vPC role priority to have the same value as Switch-A.
C. Disable and then re-enable the vPC peer-keepalive link.
D. Configure the local vPC role priority to have a lower value than Switch-A.
E. Disable and then re-enable the vPC peer link.
Answer: BE
Latest 300-615 Dumps Valid Version with 95 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund