Adobe AD0-E302 Adobe Campaign Standard Business Practitioner Online Training
Adobe AD0-E302 Online Training
The questions for AD0-E302 were last updated at Dec 26,2024.
- Exam Code: AD0-E302
- Exam Name: Adobe Campaign Standard Business Practitioner
- Certification Provider: Adobe
- Latest update: Dec 26,2024
A campaign business practitioner needs to build an A/B test email campaign for two different promotions.
By the theme that generates the most website visits, which email metric indicates the winning promotion theme?
- A . Highest Click through rate
- B . Lowest unsubscribe rate
- C . Highest open rate
- D . Lowest activity rate
On a Friday, A Practitioner decides to send Deliveries on Monday at 8 AM. The deliveries must have the most up-to-date target.
What should the Practitioner configure before starting the campaign workflow?
- A . extraction date
- B . contact date
- C . scheduler
- D . approval
A Practitioner has customized a delivery for men, women and unspecified gender values. A proof personalized to each gender segment is then required to be sent to an approver prior to the delivery phase.
What is the efficient way to accomplish this?
- A . Specify a Target for the proofs with the Targeting mode set to "Substitution of the address" and specify the approver for a recipient in each of the gender segments.
- B . Specify an approver in the Recipient table via the Target mapping directly.
- C . Create three different deliveries for each of the gender segments and define the same approver for each delivery.
- D . Specify a Target for the proofs with the Targeting mode set to "Substitution of the address" and specify the approver for a recipient using Random profile.
Which three factors can be tested in an email preview prior to executing the delivery? (Choose three.)
- A . mirror pages
- B . personalization
- C . spam score
- D . opt-out link
A workflow including a scheduler with a recurring frequency contains a regular delivery step.
What is the result?
- A . The delivery executes once and errors on the second send.
- B . The delivery executes once and enters a finished state.
- C . The delivery throws a warning message and executes as scheduled for first and second send.
- D . The delivery is sent as scheduled for the first and second send
The number of records out of union is less than intended.
Which conclusion should be made?
- A . The target is dropping inactive records.
- B . The target schemas are NOT the same.
- C . The target is dropping exclusions.
- D . The target populations are NOT mutually exclusive.
Which workflow activity should be used to export data?
- A . Data download
- B . List update
- C . Update data
- D . Data extraction
A workflow log indicates an incompatible document type error on a union activity.
How should a campaign business practitioner verify the union activity inputs are based on?
- A . The union activity’s inputs are based on the same target mapping
- B . The union activity’s inputs are based on the same filtering dimension
- C . The union activity’s inputs are based on the same targeting dimension
- D . The union activity’s inputs are based on the same global dictionary
An email and direct mail is sent with the below recipient as the target. Their blacklist is shown below.
Which recipients receive deliveries and by which channel?
- A . Email: B,D; Direct Mail: A,B,C,D
- B . Email: A,C; Direct Mail: <none>
- C . Email: D; Direct Mail: C,D
- D . Email: A,B,C; Direct Mail: A,B
More than one person in an approval operator group responds to an approval activity that requires a single response.
What is the result?
- A . The workflow errors if people in the operator group give different responses.
- B . The workflow resumes after the first person in the operator group responds.
- C . The workflow errors if more than one person from the operator group responds.
- D . The workflow pauses until all members of the operator group responds.