A customer has a company Cwide power outage scheduled and needs to gracefully power off a 2-node cluster. In this scenario, which two steps should be performed? (Choose two.)
A . Use the halt Cnode Cskip-lif-migration-before-shutdown true Cinhibit-takeover true command.
B . Use the half Cnode * command
C . Use OnCommand system Manager to half the controllers.
D . Invoke and AutoSupport message to indicate aplanned maintenance time.
Answer: AD
Latest NS0-194 Dumps Valid Version with 60 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund