CORRECT TEXT

CORRECT TEXT

A VxRail implementation engineer is validating the network environment with NVT. The proposed switch configuration is shown in the exhibit. The ToR Switch information file is available.

Use the VxRail simulator to set up NVT for switch validation. Import the switch Information and tag the ports based on the exhibit.

Answer: Click import switch -> select file that already provide -> click next

Latest DES-6322 Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments