Which two sets of actions will accomplish this task?
You need to design a PDI job that will execute a transformation andthen send an e-mail with an attached log of the transformation’s execution.
Which two sets of actions will accomplish this task? (Choose two.)
A . In the mail entry’s options, select the ‘Attach files to message’ option and select the filetype ‘Log’
B . In the Transformation entry option, select the ‘Specify logfile’ option and enter a name and extension for the file.
C . In the log tab of job properties, configure the Log Connection and the Log table options for the Job entry log tablesection.
D . In the Mail entry’s options, select the ‘Attach files to message’ option and select the file type General’
Answer: B,D
Latest HCE-5920 Dumps Valid Version with 60 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund