What is the correct order of steps the architect needs to take to complete the SRDF setup?

DRAG DROP

An architect is configuring BCSD to design SRDF/S between two new PowerMax arrays. The architect has completed the tasks for the local side of the solution, including RA Port Group, Replication Group, and site switch.

What is the correct order of steps the architect needs to take to complete the SRDF setup?

Answer:

Latest DES-1111 Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments