Two ArubaOS-CX switches ate part of a Virtual Switching Extension (V5X) fabric. Is this a guideline for configuring the switches’ link-up delay settings?

Two ArubaOS-CX switches ate part of a Virtual Switching Extension (V5X) fabric. Is this a guideline for configuring the switches’ link-up delay settings?

Solution: Set the link-up delay timer based on the number of MAC forwarding, ARP, and routing table entries.
A . Yes
B . No

Answer: B

Latest HPE2-W09 Dumps Valid Version with 79 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments