A. The source system is non-Unicode and the target database is a scale-out system.
B. The target database size increases temporarily because of the Shadow Repository.
C. SAP HANA Landscape Reorganization required a manual step to edit a file.
D. Network capacity between exporting and importing R3load processes must be.
E. Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.
Answer: C,E