- All Exams Instant Download
In this scenario, what would cause this problem?
You have configured three logical tunnel interfaces in a tenant system on an SRX1500 device. When committing the configuration, the commit fails.
In this scenario, what would cause this problem?
A . There is no GRE tunnel between the tenant system and master system allowing SSH traffic
B . There is no VPLS switch on the tenant system containing a peer It-0/0/0 interface
C . The SRX1500 device does not support more than two logical interfaces per tenant system
D . The SRX1500 device requires a tunnel PIC to allow for logical tunnel interfaces
Answer: B
Explanation:
Reference: https://www.juniper.net/documentation/en_US/junos/topics/topic-map/logical-systems-overview.html
Latest JN0-635 Dumps Valid Version with 88 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments