What factor should a Consultant recommend using in a Scheduling Policy to meet the above requirement?
Universal Containers has an initiative to reduce their carbon footprint.
What factor should a Consultant recommend using in a Scheduling Policy to meet the above requirement?
A . Give the Minimize Travel Service Objective the highest weight.
B . Remove the ASAP Service Objective.
C . Remove the Match Location Work Rule.
D . Add the Maximum Travel From Home Work Rule.
Answer: A
Latest FSL-201 Dumps Valid Version with 105 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments