What step type should be used in engagement studio if a user wants to branch prospects down two paths based on actions taken on a marketing asset?
What step type should be used in engagement studio if a user wants to branch prospects down two paths based on actions taken on a marketing asset?
A . Rule
B . Wait
C . Trigger
D . Action
Answer: D
Latest PDX-101 Dumps Valid Version with 202 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
I would say Trigger is the right answer to this question
The correct answer is C. Trigger
Trailhead:
“Use trigger steps to define paths in your engagement program based on prospect actions. Triggers listen for an event to occur within a specified period of time. This means that Trigger logic doesn’t evaluate a prospect’s actions for all time. Instead, during the window of time you’ve chosen for the step, the program looks to see if that event has occurred at any time since the prospect entered the program.
A trigger is there to answer the question, “Has the prospect done this?” A trigger is a branch point, so whether a prospect has taken an action or not determines the branch they will continue down.”