Change control systems include provisions to implement changes without formal review in the event of an emergency. When this provision is utilized:
Change control systems include provisions to implement changes without formal review in the event of an emergency. When this provision is utilized:
A . changes can be applied without further managerial involvement.
B . changes must still be documented and captured.
C . the risk associated with the change is not evaluated.
D . a change control board should be established
Answer: A
Latest PMI-PBA Dumps Valid Version with 200 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments