Which of the following requirements did the testing plan confirm?
The outputs of the old and new applications were compared side by side.
Which of the following requirements did the testing plan confirm? (Select two.)
A . High availability
B . Performance
C . Connectivity
D . Data integrity
E . Sizing
F . Security
Answer: B,D
Latest CV0-002 Dumps Valid Version with 328 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments