Six Sigma LSSGB Lean Six Sigma Green Belt Online Training
Six Sigma LSSGB Online Training
The questions for LSSGB were last updated at Nov 22,2024.
- Exam Code: LSSGB
- Exam Name: Lean Six Sigma Green Belt
- Certification Provider: Six Sigma
- Latest update: Nov 22,2024
The use of station warning lights, tool boards and jidohka devices in the application of Lean accomplish which of these principles?
- A . Pilferage Minimization
- B . Visual Factory
- C . Management Awareness
- D . Operator Attentiveness
A Lean Principle that addresses efficiency by the process worker is called ____________________?
- A . Visual Factory
- B . Supervising
- C . Training
- D . Standardizing
While management of a company must set the stage for all improvement efforts, which of these 5S’s is primarily driven by management?
- A . Straighten
- B . Sort
- C . Shine
- D . Sustain
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.
- A . Kanban
- B . Kaizen
- C . Poke-Yoke
- D . WhoSai
The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.
- A . True
- B . False
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .
- A . Well documented
- B . Removed from the line
- C . Mistake proofed
- D . Highly visible
The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
- A . Shining
- B . Standardizing
- C . Sustaining
- D . Sorting
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
- A . True
- B . False
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).
- A . Common
- B . Random
- C . Uneducated
- D . Special
- E . Vital
When it comes to Control one of the most effective means of eliminating defects is to ____________.
- A . Train personnel often and thoroughly
- B . Keep a Six Sigma project going on the process at all times
- C . Design defect prevention into the product
- D . Have each process consist of no more than five steps