An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment

HOTSPOT

An integrator has installed a new Synergy frame into a rack with two existing Synergy frames in a customer’s environment.

Click where the integrator should verify that the cabling for the management ring was completed correctly.

Answer:

Explanation:

Reference: https://support.hpe.com/hpsc/doc/public/display?docId=a00048164en_us

Latest HPE0-S58 Dumps Valid Version with 97 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments