How can the administrator ensure the duplications run as soon as possible after the backup completes?
Storage Lifecycle Policy (SLP) SLP1 is used to perform a backup and duplication. The backup is always a small, 100MB backup. The master server host properties for SLP Parameters are set to the default values.
How can the administrator ensure the duplications run as soon as possible after the backup completes?
A . reduce the “Job submission interval” setting to 0
B . reduce the “Minimum size per duplication job” setting to 50MB
C . right-click SLP1 and select Manual Relocation to Final Destination
D . increase the “Priority for secondary operations” in the SLP
Answer: B
Latest VCS-279 Dumps Valid Version with 89 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments