Which three documents should be provided to the customer after the e-Series installation is complete? (choose three.)
Which three documents should be provided to the customer after the e-Series installation is complete? (choose three.)
A . a document showing how much space is available for system expansion
B . a b a document with IMT pages that show the supported host configuration and fabric switches in the solution
C . a document showing available power on the UPS with no equipment connected
D . a document showing the cabinet layout with cabling information and IP addresses being used
E . a document showing user IDs and passwords for all deployed devices
Answer: BDE