A dual controller SC Series is connected to a dual fabric and the system is running m Virtual Port Mode When failover is tested, the system does not work as expected What must be changed to correct this issues?

Refer to the Exhibit:

A dual controller SC Series is connected to a dual fabric and the system is running m Virtual Port Mode When failover is tested, the system does not work as expected What must be changed to correct this issues?
A . Path from the left controller connected to the right switch needs to be configured into Domain 2
Path from the light controller to the left switch needs to be configured into Domain 1
B . Configure the path from the right controller port 1 into Domain 1.
Configure the path from the light controller port 2 into Domain 1.
C . Path from the left controller connected to the light switch needs to be moved to the left switch
Path from the right controller connected to the left switch needs to be moved to the right switch
D . Configure the path from the left controller port 1 into Domain 2
Configure the path from the left controller port 2 into Domain 2

Answer: D

Latest DEE-1721 Dumps Valid Version with 62 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments