What other setting need to be selected in addition to the frequency value?

A fixed-schedule PM needs to be set up.

What other setting need to be selected in addition to the frequency value?
A . Alert Lead (DAYS) must equal 0
B . Alert Lead (DAYS) must be greater than 0
C . use Last Work Order’s Start Date to Calculate Next Due Date? checked
D . Use Last Work Order’s Start Date to Calculate Next Due Date? unchecked

Answer: C