You want to move one of your leaf switches connecting to your ACI fabric to another rack.it will be reconnected to the same fabric after the move.
You want to move one of your leaf switches connecting to your ACI fabric to another rack.it will be reconnected to the same fabric after the move.
Which operations must you preform before the move ?
A . Decommission the switch and remove from the controller
B . Decommission the switch
C . Blacklist the ports
D . Disable the interfaces
Answer: B