What is one problem with phase-gate Milestones?

What is one problem with phase-gate Milestones?
A . They assume a point Solution exists and can be built right the first time
B . They force design decisions too late in the process
C . They account for variability inherent in the process
D . They require the Product Owner to act as gatekeeper or guardian of the process

Answer: A

Explanation:

Phase-gate milestones are traditional project management mechanisms that mark the end of one phase and the beginning of another. One major problem with phase-gate milestones is that they assume a point solution exists and can be built correctly the first time. This assumption does not account for the iterative nature of Agile methodologies, where solutions are developed incrementally and iteratively, with feedback loops and continuous improvement. Assuming a point solution can be finalized early often leads to rigidity, lack of adaptability, and higher risks of delivering a product that does not meet the actual needs or expectations.

Latest SAFe SASM Dumps Valid Version with 60 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments