An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building’s energy using systems is to
An essential goal of retro commissioning, re-commissioning, or on-going commissioning for a building’s energy using systems is to
A . reduce CFC-based refrigerants in HVAC&R base building systems
B . produce a master list of findings related to the commissioning process
C . execute an energy audit that meets requirements of ASHRAE Level 2
D . identify opportunities for cost-effective reduction in energy consumption
Answer: D
Explanation:
Retro-commissioning, re-commissioning, or on-going commissioning are quality assurance processes for existing buildings that aim to optimize performance and improve building operation. One of the essential goals of these processes is to identify opportunities for cost-effective reduction in energy consumption123. This involves verifying and documenting that the building and its systems and assemblies are operating efficiently and meet the current requirements of the building3.
Reference: LEED v4: Building Operations + Maintenance Guide | U.S. Green Building Council LEED v4.1 OPERATIONS AND MAINTENANCE – WAP Sustainability Consulting Building Operations & Maintenance – Canada Green Building Council (CAGBC) Guide to the LEED AP Operations and Maintenance (O+M) Exam Technical Guidelines on Retro-commissioning Existing Building Commissioning: Retro-commissioning and Re-commissioning with EAB EC Re-Commissioning | NJ Green Building Manual