The facility manager has implemented ultraviolet air treatment. According to WELL requirements, which step should the WELL AP take regarding UV system maintenance and inspection?

The facility manager has implemented ultraviolet air treatment. According to WELL requirements, which step should the WELL AP take regarding UV system maintenance and inspection?
A . Conduct an energy audit of the HVAC system
B . Review whether existing ventilation systems have been tested and balanced
C . Take pictures of the cooling coils being irradiated and submit them through the WELL digital platform
D . Find evidence that required components have been replaced or maintained according to manufacturer’s recommendation

Answer: D

Explanation:

Feature X08 requires projects to implement air treatment systems that reduce the concentration of contaminants in the air. Ultraviolet air treatment is one of the options that can be used to meet this feature. However, the project must also provide evidence that the required components of the UV system, such as lamps, ballasts, and filters, have been replaced or maintained according to the manufacturer’s recommendation. This ensures that the UV system is functioning properly and effectively. The other options are not directly related to the UV system maintenance and inspection.

Reference: = WELL v2 Feature X08: Air Treatment, UV Air Treatment Systems

Latest WELL-AP Dumps Valid Version with 194 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments