Which of the following capacity planning methods uses the master production schedule (MPS) as its primary input?

Which of the following capacity planning methods uses the master production schedule (MPS) as its primary input?
A . Resource planning
B . Rough-cut capacity planning (RCCP)
C . Finite loading
D . Input/output analysis

Answer: B

Explanation:

Rough-cut capacity planning (RCCP) is a type of capacity planning method that uses the master production schedule (MPS) as its primary input. RCCP is a technique for checking the feasibility of the MPS by comparing the available capacity of critical resources (such as machines, labor, or materials) with the capacity required by the MPS. RCCP helps to identify and resolve any potential capacity problems or bottlenecks at an aggregate level, before committing to the MPS. RCCP can also be used to evaluate alternative MPS scenarios and to support the sales and operations planning (S&OP) process12.

References: 1 Rough Cut Capacity Planning (RCCP) – Definition, Example, and … 3 2 CPIM Exam References – Association for Supply Chain Management

Latest CPIM-8.0 Dumps Valid Version with 150 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments