What is the result of this action?
An engineer must start a software upgrade on a Cisco Nexus 5000 Series Switch during a zone merge.
What is the result of this action?
A . The zone merge stops.
B . The zone merge pauses until the upgrade completes
C . The upgrade stops
D . The zone merge executes and then the upgrade completes.
Answer: A
Explanation:
Starting a software upgrade on a Cisco Nexus 5000 Series Switch during a zone merge will result in the zone merge process stopping. This is to prevent any conflicts or issues that may arise from performing two significant operations simultaneously.
https://www.cisco.com/c/en/us/td/docs/switches/datacenter/nexus5500/sw/upgrade/602_N2_2/n5500_upgrade_downgrade_602_n2_2.html
Latest 350-601 Dumps Valid Version with 138 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund