What is the expected outcome?

An engineer changed the TPC Power Threshold for a wireless deployment from the default value to – 65 dBm. The engineer conducts a new post-deployment Survey to validate the results.

What is the expected outcome?
A . Increase cell size
B . Decreased client signal strength
C . Increased received sensitivity
D . Decreased channel overlap

Answer: A

Latest 300-425 Dumps Valid Version with 100 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments