For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for
A . site conditions
B . massing and orientation
C . plug and process load needs
D . building envelope performance

Answer: C

Explanation:

For major renovation and new construction projects, the required energy and water-related system analyses should be the same except for plug and process load needs. Plug and process loads are the electrical loads that are not related to lighting, heating, ventilation, and air conditioning (HVAC)systems, such as computers, appliances, equipment, and machinery. Plug and process load needs may vary depending on the type and function of the building, and they can have a significant impact on the energy performance and demand of the building. Therefore, the project team should analyze the plug and process load needs for each project and design strategies to reduce or optimize them. The other factors, such as site conditions, massing and orientation, and building envelope performance, are common to both major renovation and new construction projects, and they should be analyzed in the same way for both types of projects.

References:

• LEED v4 Reference Guide for Building Design and Construction, Integrative Process Credit: Integrative Process, page 811

• Integrative Process Worksheet2