What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?
A . One
B . Two
C . Four
D . Six

Answer: C

Explanation:

According to the LEED Reference Guide for Building Design and Construction1, the Integrative Process Prerequisite, Integrative Project Planning and Design, requires the project to assemble an integrated project team that includes at least four key project team members, in addition to the owner or owner’s representative. The key project team members are those who have the authority and responsibility to make design decisions and implement them during construction. The integrated project team should include professionals from different disciplines, such as architecture, engineering, landscape, interior design, construction, commissioning, operations, and maintenance. The integrated project team should collaborate throughout the project phases, from discovery to occupancy, to achieve the project goals and optimize the building performance.

References:

LEED Reference Guide for Building Design and Construction v4

Integrated Product Team (IPT) – AcqNotes

The Power of an Integrated Project Team Process – Little

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments