What is a cause of the issue?
Dell EMC Avamar backups completed successfully. However, garbage collection, checkpoints, and HFS check operations did not run in the last 24 hours.
What is a cause of the issue?
A . Maintenance scheduler is suspended
B . Replication prevented the activities from starting
C . Avamar server utilization is at 100% of user capacity
D . Maintenance window duration is configured for 10 hours
Answer: A
Latest D-AV-DY-23 Dumps Valid Version with 390 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments