What is a cause for this issue?
A backup administrator has created a backup group to run daily, the next day the backup did not start on the scheduled time.
What is a cause for this issue?
A . Group is configured with multiple schedules
B . Group is scheduled to run outside the backup window
C . Group is disabled
D . Group is not in the same domain as its clients
Answer: C
Latest D-AV-DY-23 Dumps Valid Version with 390 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments