The CSIRT team is following the existing recovery plans on non-production systems in a PRE-BREACH scenario. This action is being executed in which function?
The CSIRT team is following the existing recovery plans on non-production systems in a PRE-BREACH scenario. This action is being executed in which function?
A . Protect
B . Recover
C . Identify
D . Respond
Answer: B
Latest D-CSF-SC-23 Dumps Valid Version with 110 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments