Atlassian ACP-610 Managing Jira Projects for Data Center and Server Online Training
Atlassian ACP-610 Online Training
The questions for ACP-610 were last updated at Nov 22,2024.
- Exam Code: ACP-610
- Exam Name: Managing Jira Projects for Data Center and Server
- Certification Provider: Atlassian
- Latest update: Nov 22,2024
A project was created with a shared configuration.
Which two configurations were shared? (Choose two.
- A . component lead assignments
- B . versions
- C . transition screens
- D . project role membership
- E . project permissions
You are a project administrator of DEV. Omar is a Jira administrator.
Identify two project settings that Omar can update in DEV but you cannot. (Choose two.)
- A . Notification scheme
- B . Project shortcuts
- C . Key
- D . Description
- E . Name
- F . Versions
A Jira administrator just created a new project based on the "Task management" project template.
Which Jira feature is enabled in this project by default?
- A . Epic issue type
- B . ranking of standard issue types
- C . Issue analysis reports
- D . Release Hub
The team requests that you update the name of your project.
What impact will this have on Jira?
- A . The URL for issues will change.
- B . The project key will change.
- C . Issue filters may need to be updated.
- D . Issue search will not find issues from that project until Jira is re indexed.
You are moving an epic between projects that share an issue type scheme.
Which issues are moved along with the epic5
- A . all standard issues in the epic
- B . all standard and sub-task issues in the epic
- C . only Story issues in the epic
- D . all sub-tasks of the epic itself
- E . all issues linked to the epic through issue links
Which statement is definitely true about sub-tasks being used on a Scrurn board?
- A . Sub-task estimations are rolled up and displayed as the Original Estimate on the parent card.
- B . Sub-tasks can only be created by board administrators
- C . Sub-tasks can be displayed as cards in the Active sprints view.
- D . Sub-tasks can be displayed as cards in the Backlog view.
- E . Sub-tasks will automatically get resolved when the parent is moved to the Done column.
A project uses several issue Types that have different workflows.
Sam can only see some of the issues on the project’s Kanban board but sees all of them in the issue search.
Identify a possible reason.
- A . board permissions
- B . column mapping
- C . issue-level security
- D . workflow conditions
Your team uses a custom field of type Labels to track keywords associated with incoming requests. Issues can have multiple keywords, and new keywords can be added at any time. They want to see keywords displayed prominently when viewing all cards on a board.
Which configuration meets this need?
- A . card layout
- B . swimlanes
- C . card colours
- D . issue detail view
Sam and Jo are product managers responsible for two separate products. Each product has its own Jira project and a corresponding Scrum board.
Management requests an integration between the products. Sam and Jo decide to create all the integration-related issues in Sams project and label them integration".
Jo updated his Scrum board’s saved filter to include the relevant integration issues from Sam’s project.
Which statement is definitely true?
- A . All integration issues always appear on top of Jo’s backlog.
- B . Changes to the rank of integration issues on Jo’s board are reflected on Sam’s board.
- C . Jo is unable to rank integration issues created by Sam.
- D . Sam is unable to transition integration issues that were ranked by Jo.
- E . Integration issues can only be ranked on Sam’s board.
A team currently uses a single project to track both features and tasks.
They will be adopting aqile practices, as follows:
• Features will be developed during three week iterations.
• Tasks will be handled based on priority and rank and released incrementally as needed.
they want to use agile boards with minimal disruption to their current configuration.
Which solution will meet their requirements?
- A . a Kanban board in the current project with separate swimlanes per issue type
- B . two Scrum boards for the current project, one for each issue type
- C . a Scrum board in the current project with two quick fillers to show each issue type separately
- D . a second project for tasks with a shared configuration and separate boards per project
- E . a Kanban board for tasks and a Scrum board for features in the current project