If a waveform period is determined to be 10 microseconds in duration, what is the frequency of the signal?
- A . 100 kHz
- B . 10 kHz
- C . 1000 Hz
- D . 100 Hz
Data Center Precision Cooling Systems maintain temperature within _____________ degree(s) of their design set point.
- A . 1
- B . 2
- C . 3
- D . 5
True or False: Human error is a major cause of data center downtime
- A . True
- B . False
A __________ generator system is a combination of an electrical generator and a mechanical engine mounted together to form a single piece of equipment.
- A . passive
- B . standby
- C . active
- D . software
Which one of the following is an overall consideration for physical security?
- A . Apply the technology
- B . Apply the solution
- C . Identify the problem
- D . Define the problem
True or False: Fuel availability generally dictates the type of standby generator selected
- A . True
- B . False
True or False: Fuel availability generally dictates the type of standby generator selected
- A . True
- B . False
Which one of the following controls the voltage produced at the output of the alternator?
- A . Voltage Meter
- B . Voltage Stabilizer
- C . Voltage Regulator
- D . Voltage Backup Device
Which one of the following is a Physical Security Identification Method?
- A . Voice
- B . Expression
- C . Sound
- D . Batch ID
What is a Data Center?
- A . A building or portion of a building whose primary function is to research new data.
- B . A room in a building dedicated to monitoring data and information.
- C . A building or a portion of a building whose primary function is to house a computer room and its related support areas