When performing power on/off operations on Huawei heterogeneous servers, which description is incorrect?

When performing power on/off operations on Huawei heterogeneous servers, which description is incorrect?
A . Before powering on, ensure that the power switch is in the off state, and all cables are correctly connected, and the power supply voltage meets the requirements of the device.
B. If the compute node has just been powered off, wait at least 1 minute before reconnecting the power.
C. When powering on, do not plug or unplug hard drive modules, network cables, or console port cables.
D. Forcing a power-off while the hard drive is performing read/write operations will not cause bad sectors on the hard drive, but it will damage the data source.

Answer: D

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments