Which of the following is a valid upgrade path?
You are currently running productively on the 2020 base release of RISE with SAP S/4HANA Cloud, private edition.
Which of the following is a valid upgrade path?
A . An upgrade is NOT possible until 2024 because the current version is in mainstream maintenance.
B. Upgrade to release 2021 after May 2021.
C. Upgrade to release 2021 after November 2021.
D. The system will be upgraded automatically every quarter.
Answer: D
Latest E_S4CPE_2023 Dumps Valid Version with 40 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments