Which two sections of the report should you review?

You plan to migrate an SAP ERP Central Component (SAP ECC) production system to Azure.

You are reviewing the SAP EarlyWatch Alert report for the system.

You need to recommend sizes for the Azure virtual machines that will host the system.

Which two sections of the report should you review? Each correct answer presents a complete solution. NOTE: Each correct selection is worth one point.
A . Hardware Capacity
B. Patch Levels under SAP Software Configuration
C. Hardware Configuration under Landscape
D. Database and ABAP Load Optimization
E. Data Volume Management

Answer: A,C

Explanation:

References: https://wiki.scn.sap.com/wiki/display/SM/Hardware+Capacity+Checks+in+EWA

Latest AZ-120 Dumps Valid Version with 125 Q&As

Latest And Valid Q&A | Instant Download | Once Fail, Full Refund

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments