Which two criteria are useful in deciding if something should be documented every Sprint? (choose best two answers)
Which two criteria are useful in deciding if something should be documented every Sprint? (choose best two answers)
A . It has always been documented in the past.
B. It is required by the Definition of Done.
C. The Software tool being used requires it.
D. The documentation is used to enhance and maintain the Software.
E. The Scrum Master requires it.
Answer: B,D
Latest PSD-I Dumps Valid Version with 166 Q&As
Latest And Valid Q&A | Instant Download | Once Fail, Full Refund
Subscribe
Login
0 Comments
Inline Feedbacks
View all comments